|
PROPERTY DATA |
|
|
More Information on Prop ID - RS 1421 |
|
|
|
|
|
|
|
|
|
Ownership Type |
Freehold |
|
|
|
|
|
|
|
|
|
|
PAYMENT SCHEDULE |
|
|
|
Stage |
% of Total |
|
|
|
At the time of Agreement |
30% |
|
|
|
On Completion of Foundation |
10% |
|
|
|
On Completion of Plinth |
10% |
|
|
|
On Completion of Ground Floor Slab |
10% |
|
|
|
On Completion of First Floor Slab |
10% |
|
|
|
On Completion of Second Floor Slab |
10% |
|
|
|
On Completion of Masonry |
5% |
|
|
|
On Completion of Plaster |
5% |
|
|
|
On Completion of Tiling |
5% |
|
|
|
On Obtaining Occupancy Certificate |
5% |
|
|
|
Total |
100% |
|
|
|
|
|
|
|
|
Note |
|
|
|
|
Above schedule is at commencement of construction. Payment has to be made as per the construction completed at the time of booking. |
|
|
|
|
|
|
|
Govt. Registration charges & Stamp duty as of 1st April, 2012 is based on value of the properties as below. |
|
|
Property Value |
Govt. Registration charges |
Stamp duty |
|
|
Upto Rs. 25 lakhs |
2% |
2% |
|
|
Over Rs. 25 lakhs upto 50 lakhs |
3% |
2% |
|
|
Over Rs. 50 lakhs upto 1 Crore |
4% |
2.5% |
|
|
Above 1 Crore |
5% |
3% |
|
|
|
|
|
|
|
Service Tax @ 3.09% |
|
|
|
|
|
|
|
OTHER CHARGES |
|
|
Maintenance Charges |
After formation of society or owners association. |
|
|
electricity meter charges |
Rs. 25,000/- |
|
|
House tax as applicable |
|
|
|
|
|
|
|
BANKS THAT HAVE APPROVED FOR HOME LOAN |
|
|
State Bank of India |
|
|
|
|
|
|
|
CONSTRUCTION SPECIFATION |
|
|
STRUCTURE:- R.C.C. framed structures: - The external walls will be laterite / brick 23 cm. thick Internal partition walls will be 11.5 cm brick Masonry. |
|
|
PLASTER:- External plaster will be double coat sand cement plaster. Internal plaster will be single coat with cement plaster with ready putty / stucco plaster. |
|
|
FLOORING:- Vitrified flooring / Rustic tiles or equivalent for Apartment. Toilet floor will have anti skid flooring and toilet wall tiles will be (matt or glazed) Ceramic tiles upto 1.8 mt. height |
|
|
DÉCOR:- The external walls will be painted with premium quality acrylic water-proof paint. Internal walls will be painted with acrylic emulsion. |
|
|
DOORS AND WINDOWS:- The teak wood paneled main door, other doors to be flush / teak with melamine polish. Powder coated aluminium windows. |
|
|
KITCHEN:- Granite platform with a single bowl stainless steel sink. 60-cms. Ceramic / glazed tiles above the platform will be provided. |
|
|
TOILET:- Cera Sanitary ware and reputed C.P. Jaquar / Crab Tree/ Essess or equivalent. Sanitary fittings. Provision for geyser (hot and cold arrangement). |
|
|
ELECTRICAL:- Concealed electrical conduit with Finolex or equivalent copper wiring with reputed brand Modular switches, cable T.V. Telephone point in living room & provision for A.C point in living and master bedroom. |
|
|
WATER SUPPLY:- A common underground sump of adequate capacity with a common electrical pump and a common overhead tank will be provided. |
|
|
|
|
|
|